Colorado-Real-Estate-Journal_520940

April 2026 — Health Care, Senior & Life Sciences Quarterly — Page 11 www.crej.com LIFE SCIENCES I n life science real estate, the building is never truly finished. Research priorities pivot over- night. Equipment gets replaced within 24 months – often with something larger, heavier or run- ning on utilities the building was never designed to handle. Teams reorganize. A wet lab becomes a dry lab. A pilot plant outgrows its utility infrastructure. A cGMP (cur- rent good manufacturing practice) suite gets added mid-lease because a program hit a clinical milestone nobody predicted. For landlords and tenants alike, the question is no lon- ger whether a facility will need to change – it’s whether the building is ready when it does. n The mismatch between sci- ence and buildings. Buildings are long-term assets. Science is not. A discovery-stage biotech can evolve, within a single lease term, into an organization running a pilot plant, a cGMP manufacturing space, and a computational biology team – each with entirely different structural, mechanical and utility requirements. Yet most lab buildings are deliv- ered with fixed infrastructure sized for one program at one moment in time. When the science shifts – and it will – tenants face a choice between expensive renovation or a costly relocation, and landlords face vacancy and a building that no lon- ger competes. n Design strategies that let facili- ties grow with the science. Flexibility should be treated as an engineering discipline, not a philosophy. Life sci- ence facilities should be designed around systems built for change from day one. Interstitial floors – dedicated service zones between occupied lab lev- els – allow utilities to be rerouted, upgraded, or expanded without disrupting active research above or below. Plug-and- play utility connec- tions and modular MEP systems mean one zone of the building can be reconfigured with- out triggering cascading shutdowns elsewhere. Ceiling service panels give direct access to utilities without opening walls. Exhaust and specialty gas systems deserve particular attention. The jump from a standard wet lab to a pilot plant or cGMP suite involves dramatic increases in exhaust vol- ume, chemical segregation require- ments and pressurization control. Designing flexible exhaust infra- structure – with capacity headroom and reconfigurable distribution – makes that transition possible with- out a gut renovation. Size electrical capacity, shaft space, and utility mains for future expansion, so the next program a tenant brings online is at least partially accommodated before the lease amendment is even drafted. n Planning for the program you don’t have yet. The most durable life sci- ence buildings are organized around universal lab planning modules – standardized bay dimensions that can shift between research types without structural modification. Design bays and column spacing to accommodate wet labs, dry labs, analytical suites and hybrid con- figurations interchangeably. A bay running cell-based assays today can support a process development suite tomorrow or be subdivided to serve multiple early-stage tenants the year after that. Movable casework and open lab environments extend that logic to the interior. Modular casework can be reconfigured or removed entirely as programs evolve. Avoiding unnec- essary interior partitions means teams can reorganize and workflows can scale without a construction permit. For pilot plant and cGMP environments, this is especially true: Equipment footprints change with every manufacturing campaign, and a building that resists reconfigura- tion becomes a liability. n Adjacency: The part tenants feel every day. Infrastructure flex- ibility determines what a building can become. Adjacency planning determines how well it works in the meantime. Write-up and office space placed directly adjacent to labs allows researchers to move fluidly between bench work and data anal- ysis without losing time or focus. Collaboration zones near lab areas support the cross-functional interac- tion that accelerates development timelines. Support spaces – equip- ment rooms, cold storage, shared instrumentation, gowning areas for cGMP suites – designed to flex with the lab program extend the value of every square foot. For landlords, these adjacency decisions are retention tools: Ten- ants who work efficiently within a building are far less likely to relocate at renewal, even when the program has changed significantly. n What it costs to build in – and what it costs to leave out. Our approach to life science design is rooted in a straightforward premise: The decisions that cost the least to make during design are almost always the most expensive to undo during construction. Oversizing a utility main, adding spare shaft penetrations, or specifying modular casework instead of fixed benches may add modestly to an initial project budget. Skipping those deci- sions and renovating five years later – when a tenant has scaled from a research lab to a pilot plant, or when a cGMP program needs to be layered into an existing floor plate – does not. Sophisticated tenants are now asking directly about infrastructure flexibility in requests for propos- als and lease negotiations. Land- lords who can speak to a building’s interstitial capacity, modular utility systems and universal bay planning are having fundamentally different conversations than those describing square footage and HVAC tonnage alone. Future-ready infrastructure is shifting from a premium feature to a baseline expectation – and the build- ings that lack it are competing on price rather than capability. For landlords and tenants navi- gating a market where the science never stops changing, flexibility is not a line-item expense. It is the investment that makes every other investment hold its value. s bkonczak@moaarch.com You can’t afford to build for today & hope for future Delivering industry best construction solutions to our clients’ most crucial business objectives. SERVICES Sun offers multiple project delivery methods, including design/build, design assist, design/bid/build. EXPERTISE ADAPTABILITY CREATIVITY sunconstruction.com 303.444.4780 1232 Boston Ave., Longmont, CO 80501 Brian Konczak Director of Science + Tech, MOA Architecture

RkJQdWJsaXNoZXIy